Temporary Works Design
Smarter Access, Safer Delivery: The Apsley Easter Blockade
While many of us were enjoying the long Easter weekend, our site teams executed a massive logistical effort at Apsley…
Find out moreEngineering Assurance for Station Scaffold Designs
Enable Infrastructure (formerly known as BCM Construction) looked to Enable Design (formerly known as Equate Design) to provide the Design Assurance and ensure that the specialist scaffold designs were safe and complied …
Find out moreLyminster Bridges
This scheme involved the construction of 2 no. overbridges for our client, Breheny. The first bridge was a 17m span, prestressed concrete overbridge spanning a road. The second bridge…
Find out moreFeltham Re-signalling Programme
Enable Design (formerly known as Equate Design) was contracted to support the design of the full civil engineering scope of works for the Feltham Re-signalling Project Phases 1, 2 and 5.
Find out more