Rail

Smarter Access, Safer Delivery: The Apsley Easter Blockade

While many of us were enjoying the long Easter weekend, our site teams executed a massive logistical effort at Apsley…

Find out more

Exploring Enable – Who are we?

Our CEO, Shane O’Halloran, discusses who and what Enable is and why we decided to create a new brand for a new chapter….

Find out more

The Enable Consortium Donate Specialist Donate Surveys and Volunteer Cabin to Spitalfields City Farm

Off the back of our successful delivery of the project renovating platform 17 at Liverpool Street Station for MTR Elizabeth…

Find out more

Enable Infrastructure Donate Specialist Surveys and Volunteer Cabin to Spitalfields City Farm

Our sister company Equate Design undertook a TOPO survey of the site and we employed a specialist contactor to undertake a drainage survey. We also donated a new insulated cabin which will be used as a space for regular volunteers and community groups that visit the farm.

Find out more

Enable Infrastructure Complete state of the art driver accommodation at Gidea Park Station for MTR Elizabeth line.

BCM began the works at Gidea Park for MTR Elizabeth line, in December 2020, building new Train Crew Accommodation and Cleaners Accommodation whilst improving the surrounding area including parking facilities, a bicycle shelter and EV charging points.

Find out more

Enable Infrastructure Appoint New Pre-Construction Director.

BCM appoint Dan Wiscombe as new Pre-Construction Director.

Find out more

Enable Infrastructure Expertly Deliver Liverpool Street Station Platform Extensions and Renovations for MTR Elizabeth Line.

These works have modernised parts of the station whilst increasing platform space making the area more pleasant for passengers when embarking and disembarking from the train.

Find out more

Enable Infrastructure working to improve Network Rail Track Access Points

BCM Construction has been working with Network Rail on multiple projects to renew or improve Road Rail Access Points (RRAPS), Safe Walking Routes and Track Worker Safety Sites.

Find out more

Enable Infrastructure Concluding on Tactile Installation at 100 Platforms Across 43 Stations in the Sussex, Kent and London Area.

BCM have completed the majority of planned improvement works which consisted of 100 platforms across 43 Stations in the Sussex, Kent and London area, installing in excess of 16,500m of tactile.

Find out more

The Network Rail Welsh Independent Feeder from Newport to Cardiff was successfully designed and Installed by Enable Infrastructure and Enable Powers Systems.

BCM Construction collaboratively with BCM Power Systems successfully designed (GRIP 5 Detailed Design), installed, terminated, and tested the new 15km, 25KV High Voltage Independent feeder 8501.

Find out more

Enable Infrastructure Complete Civils Element of £18m Flood Defence Scheme

BCM have completed their section of works for Jacksons which is part of £18m the Flood Defence Scheme contracted by the Environment Agency.

Find out more

Lyminster Bypass Scheme Phase 1 Complete

Watch 9 months’ worth of work in 3 minutes as part of BCM Construction’s involvement on the Lyminster Bypass Scheme!

Find out more