Case studies: Temporary Works Design

Station Scaffold Design

Temporary Works Design

Project Commenced: October 2020 Project Completed: December 2020 Client: Network Rail   About the Project As part of the CAPEX framework, BCM Construction were engaged by Network Rail to undertake refurbishment works of various station buildings in the South East region. These works included repointing and painting of facades, works to existing gutters and works to canopy rooves…

Haul Road and Temporary Bridges & Car Park Design – St Brides Sub Station

Temporary Works Design

Project Value: £1.9m Project Commenced: October 2017 Project Completed: January 2019 Client: Network Rail   About the Project BCM Construction and design partner – Equate Design delivered the final substation as part of the Network Rail Great Western Electrification Programme (GWEP) at Newport St Brides. All eyes were on this final milestone due to the final piece of the Entry into…

Lyminster Bridges

Professional Services Temporary Works Design

Project Value: £3.6m Project Commenced: June 2020 Project Completed: June 2021 Client: Breheny   About the Project This scheme involves the construction of 2 no. overbridges for our client Breheny. The first bridge is a 17m span, prestressed concrete overbridge spanning a road. The second bridge is a 30m span, prestressed concrete overbridge spanning a railway which required an 800T crane to install the deck beams. The bridges were critical activities…